bid close on Township bridge replacement June 18

TOWNSHIP BRIDGE REPLACEMENT

PROJECT S.A.P. 051-599-107

BIDS CLOSE JUNE 18, 2019

Sealed proposals will be received by the Board of County Commissioners of Murray County, Minnesota, at the Murray County Government Center, County Auditor, 2500 28th Street, Slayton, MN 56172 until 10:30 o’clock A.M., June 18, 2019 for the following bridge project:

SAP 051-599-107 (Br No 51J61) Lime Lake Township

The major quantities of work include:

Remove Pipe Culvert229 Lin Ft

10’x8’ Prec Conc Box End Sec2 Each

10’x8’ Prec Conc Box CulvLin Ft

Aggregate Backfill (LV)1072 Ton

15” CS Pipe Culvert200 Lin Ft

Sediment Control Log80 Lin Ft

Erosion Control Blanket535 Sq Yd

Seeding0.11 Acre

All bids shall be made on forms included in proposal and shall be accompanied by bid security in the form of a certified check or bid bond, made payable to Murray County Treasurer in the amount of five (5%) percent of the bid, which security becomes the property of the County in the event the successful bidder fails to enter into a contract and post satisfactory bond.

The proposed contract is subject to minimum wage rates set forth by the Minnesota Department of Labor and Industry and incorporated into the Specifications. The County reserves the right to reject any or all proposals and to waive technicalities and irregularities.

Proposals and Plans may be secured from the Murray County Highway Department 3051 20th Street, Slayton, MN  56172; PHONE 507-836-6327 FAX 507-836-8891 OR the County Website www.murraycountymn.com.

Proposal/Plan  $100.00  (tax/shipping included)

(Non-refundable)

Free on website www.murraycountymn.com

Heidi Winter

22-5c County Auditor/Treasurer

S, 5/22, 29 & 6/5, 2019